Scheduling a Report
You can schedule a report to run automatically at a configured time interval.
➢ | To schedule a report: |
1. | Open the Scheduled Reports page (Statistics > Reports > Scheduled Reports). |
2. | Click Add Scheduler. |
3. | Configure the report scheduler using the following table as a reference. |
Scheduler
Column |
Description |
||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Details |
|||||||||||||
Active |
Toggle the 'Active' switch to activate or deactivate the scheduler. |
||||||||||||
Scheduler Name |
Enter an intuitive, management friendly name for the scheduler. |
||||||||||||
Description |
Enter a description for the scheduler to facilitate management for other operators. |
||||||||||||
Scheduler Scope |
From the drop-down list, select the relevant Service Provider tenant |
||||||||||||
Report Name |
From the drop-down, select a report name. Scroll down to view the full list of options. Auto complete is also supported.
The Report Info displayed below the drop-down list is updated accordingly.
|
||||||||||||
Scheduler |
|||||||||||||
Report Generation Period |
Select either Hourly (default), Daily, Weekly or Monthly. Determines how frequently reports will be generated. Select one of the following:
|
||||||||||||
Repeat |
From the drop-down list, select one of the following:
|
||||||||||||
File to Save |
Select either None, CSV or PDF. |
||||||||||||
Max Number Of Files To Save |
Defines the number of historical reports. Default: 60. If CSV or PDF is selected for the preceding parameter, the field is activated, and the default can be modified. |
||||||||||||
File to Send |
Select either None, CSV or PDF. |
||||||||||||
Mail To |
If CSV or PDF is selected for the preceding parameter, the 'Mail To' field is activated and a destination email address or multiple destination email addresses can be entered. |
4. | Click OK. The new scheduled report is displayed. |
5. | Return to the Reports page and note the Scheduler icon is displayed adjacent to the new entry. |