Installing the OCP Card (Configuration Options B and C)
This section describes how to install the OCP card for configuration options B and C (see Network Configurations).
For detailed information, watch the video tutorial.
| ➢ | To install the OCP card: |
| 1. | Power off the server and disconnect it from the power source. |
| 2. | Install the OCP SFP+ network card, as described in Dell's documentation. |
| 3. | Connect the optic cables (see Connecting Device to IP Network with SFP+). |
| 4. | Power on the server. |
When the device completes loading, the new SFP+ ports are labeled GE_9 to GE_12.