Pre-requirements For Operator Approval
■ | Ensure Operator has their own trusted identity |
■ | Provide network architecture diagram for each market including SBC geo redundancy with 2x10G links via MAPSV, IPs, ASNs |
■ | Provide SBC failover logs |
■ | If Platform provider intends manage the implementation of network connectivity on behalf of the partner (meaning the platform provider does not have any existing network connectivity), submit a template network architecture that illustrates the SBC geo redundancy and use of MAPSV or if hosted in Azure use of MAPSV or Express Route. |
■ | Provide logs that illustrate BFD enabled on network links within each geo |
■ | Complete the OC Platform Provider Operator Journey/Customer Journey template |
■ | Document test cases and results for TNUpload, Call Duration (Screen shots will suffice) |
■ | Ensure Telco/Operator has access to ADO (requires that operator submits an ADO ticket) |
■ | Capture the telco/operator’s anomaly detection and monitoring habits |
■ | Demonstrate that each telco/operator onboarded has met all SLA metrics |
■ | Submit each telco/operator’s GTM plan and provide the landing page |