Deploying the Rail Kit
The type of Rail that are providing is “A11 Drop-in/Stab-in 4-Post Rail”.
This section provides information about the mounting features and key dimensions of the rack rails used for mounting the devicein a rack enclosure. This section also provides a compatibility summary for racks as well as some common third-party racks. Note that the product list is not all inclusive and updates will be made as needed.
The dimensions provided in this document are for reference only. Some minor deviations due to manufacturing tolerances and variances should be expected.
The rail kits may not be compatible with racks from other vendors, however, all rail kits are designed for compliance with all EIA-310-D and later revision specifications for 19-inch racks.
For instructions for deploying the rail system, refer to the printed instructions "Quick Deploy Rail System Installation Instructions".
Rack Mount Safety Instructions: When installing the chassis in a rack, implement the following safety instructions:
● | Elevated Operating Temperature: If installed in a closed or multi-unit rack assembly, the operating ambient temperature of the rack environment may be greater than room ambient temperature. Therefore, consideration should be given to installing the equipment in an environment compatible with the maximum ambient temperature (TA) of 35°C (95°F). |
● | Reduced Air Flow: Installation of the equipment in a rack should be such that the amount of air flow required for safe operation on the equipment is not compromised. |
● | Mechanical Loading: Mounting of the equipment in the rack should be such that a hazardous condition is not achieved due to uneven mechanical loading. |
● | Two people are required to mount the device in the 19-inch rack. |
● | When attaching the chassis to the rack, it is mandatory to connect it using both the front-mounting brackets and the rear-mounting brackets (supplied). |